Senegal · Côte d'Ivoire · Burkina Faso · TogoClient areaFREN

For an administration as for a company, an information-system outage is measured in payment delays, services at a standstill and lost trust. A business continuity plan (BCP) does not try to remove every risk: it sets what must keep running, for how long, and with what means.

1. Identify critical activities

List the processes without which the organization cannot operate: payroll, invoicing, filings, customer relations, production. For each one, link the applications, data and teams it depends on.

2. Set measurable objectives

Two indicators structure the plan: the maximum acceptable interruption time (RTO) and the amount of data it is tolerable to lose (RPO). These values must be validated by the business, not only by IT.

3. Choose the recovery means

  • Tested backups, with an off-site or cloud copy.
  • Backup infrastructure: fallback site, datacenter colocation or recovery in the cloud.
  • Redundant network links and power for essential services.

4. Document and assign roles

On the day of a crisis, nobody should have to look for who decides or where the procedure is. Write short sheets: who to alert, in what order to restart services, how to communicate with users.

5. Test, then start again

A plan that has never been tested is a hypothesis. Schedule at least one exercise a year, measure the real recovery time and fix the gaps. This discipline is what makes the plan useful.

Need an outside view to frame your approach? Our Consulting & GRC teams support you from risk analysis to the implementation of recovery solutions.

Next step

Have a project in mind? Let's talk about your need.

WhatsApp